Skip to content

Guides / Help with your part

Stuck with your drawing?
Start here.

Fix common file problems, check your drawing or choose a material. Pick the guide that matches what you need help with.

Start with
The problem you need to solve
Need a hand?
Talk to the workshop

Find the guide you need

Learn with the visual guides

Before the first order

Production is normally 1–2 days when the material is in stock, followed by next-day delivery after dispatch. Waiting for stock material can extend production. Check with us if the job has a fixed deadline.

Let’s check your part.

Send your drawing, material, quantity and any details that matter.

Talk to the team

Your design. Made in South Yorkshire.

Let’s make your part.

Upload your DXF or suitable sheet-metal STEP/STP file and choose your options.